Used 800 kW landfill biogas power plant reportedly manufactured in 2011. Still operational and currently (February 2024) with 19,442 and 19,633 hours of use. The plant includes the following equipment:
- gas extraction system with a capacity of 500 m³/hour. Option to increase capacity to 1,000 m³/hour with an additional compressor.
- system with vertical wells can cover 3.2 ha, system with horizontal wells can cover 7.5 ha of landfill area.
- remote monitoring.
- high temperature flaring unit. Landfill gas combustion temperatures between 1,000–1,200 degrees Celsius.
- (2) 400 kW container-based MWM TCG 2016 V08 C engines.
Plant information sheet available on request.
We use cookies to improve your experience. Privacy Policy.