Used biomass-coal power plant with a capacity of 1500 kW (1.5 MW). Main equipment: Turbogenerator set by Kaluga П-1,5-21/5, steam consumption 10 t, inlet pressure 21 bar, bleed steam outlet pressure 5 bar, operating time 10,000 hours. Water tube boiler, 12.5 t of steam per hour, 23 bar, 350 °C, operating time 11,000 hours. Fuel: coal and wood chips (70% - 30%). It is reported that the boiler can operate on 100% wood chips after modernisation. Additional information available on request.