Niedostępne

Zakłady - separacja powietrzna, tlen, azot, wodór

Zakłady - separacja powietrzna, tlen, azot, wodór
Magazyn #:
RG7304
USED SKID MOUNTED AMMONIA PLANTS TOTAL CAPACITY 270 TPD PLANT 1 90 TONS PER DAY BUILT 1965 – 1966 AND OPERATED UNTIL 1998. OPERATION PRESSURE: - REFORMING AND PURIFICATION SECTION: 240 psig. - SYNTHESIS LOOP - 4850 psig, MAXIMUM 5150 psig. MATERIAL CONSUMPTION: - 32.2 mmbtu PER SHORT TON AFTER STEAM CREDITS; OR - 34 mmbtu PER SHORT TON BEFORE STEAM CREDITS STEAM CONSUMPTION: 4600#/SHORT TON ELECTRICITY: 865KWH/SHORT TON PLANT 2 90 TONS PER DAY BUILT 1965 – 1966 AND OPERATED UNTIL 1998. OPERATION PRESSURE: - REFORMING AND PURIFICATION SECTION: 240 psig. - SYNTHESIS LOOP - 4850 psig, MAXIMUM 5150 psig. MATERIAL CONSUMPTION: - 34 mmbtu PER SHORT TON BEFORE STEAM CREDITS STEAM CONSUMPTION: 4600#/SHORT TON ELECTRICITY: 865KWH/SHORT TON PLANT 3 90 TONS PER DAY BUILT 1976 AND OPERATED UNTIL 1998. OPERATION PRESSURE: - REFORMING AND PURIFICATION SECTION: 240 psig. - SYNTHESIS LOOP - 4850 psig, MAXIMUM 5150 psig. MATERIAL CONSUMPTION: - 32.2 mmbtu PER SHORT TON AFTER STEAM CREDITS; OR - 34 mmbtu PER SHORT TON BEFORE STEAM CREDITS STEAM CONSUMPTION: 4600#/SHORT TON ELECTRICITY: 865KWH/SHORT TON THE THREE PLANTS ARE AVAILABLE AS A WHOLE OR ON AN INDIVIDUAL BASIS