Used biodiesel plant made by Desmet Ballestra during 2007-2008 with capacity approximately 100,000 tons/year, shut down 2009.
Plant included the following sections when commissioned:
- Oil Pretreatment: Acid degumming, continuous oil neutralising / stripping, barometric water cooling system, high pressure steam heating system.
- Biodiesel Production: Methylester and glycerine production, transesterification, methylester / glycerine separation, methanol rectification, glycerine purification and concentration, citric acid preparation, oil drying, additives dosing.
- Acid Esterification
Currently only available in situ. Plant is not complete; it requires approximately 50% of the biodiesel line and 20% of the refining line restoring.
We use cookies to improve your experience. Privacy Policy.